|
 |
|
|
|
CEO - Projects Tang Kroes School
|
|
|
|
The old public school building in Tang Kroes was over-crowded and in disrepair. A major project during 2001 was to remedy this situation and give the school children a better environment for learning. This work was undertaken with the cooperation of the local government but was funded by the CEO.
The series of related projects and improvements completed during the year include:
- Replaced old building with new construction ( new roof, walls, and concrete floor)
- New additional building with concrete floor providing additional classroom space;
- New administrative facilities and library;
- Provided classrooms with new blackboards, teachers' desks, and tables for
students;
- Distribution of books an school supplies.
|
|
|
|
|
|
|
Tang Kroes old school was dismantled and new roof walls and concrete were added.
|
|
| |
|
|
|
|
|
|
|
|
Mr. Onn Kungkea and family.
|
|
|
|
|
|
|
|
|
|
|
|
|
Tang Kroes public school built in 2001.Still over-crowded even with two buildings and six classrooms.
|
6th grade outdoor classroom with blackboard and benches
|
A wood-frame building built in 2001
|
|
|
|
|
Two classrooms are back to back in the same building with blackboards and student desks
|
A small wood-frame building used as a school library and administration building in Tang Kroes Village
|
Tang Kroes school volleyball courtyard, 2001.
|
|
|
|
|
|
|